# Reserved GPU vs On Demand: When to Commit, When Not To

Published 30 October 2026, updated 7 November 2026. 5 min read. For: ML leads and founders deciding whether to reserve GPUs for months or keep renting by the hour.

## Key facts

- Reserve when the share of the term you actually use beats the reserved price divided by the hourly price you'd otherwise pay.
- If the reserved price is 70% of your hourly price, the reservation wins only when the GPUs are busy more than 70% of the term.
- A reservation you use half the time costs double its sticker price for every useful hour; at 25% use, four times.
- Arrakis reservations run from one month up, 25% paid at signing and the rest monthly, at a price per GPU-hour fixed for the term.
- Reserve the floor of your usage and rent the peaks by the hour; idle reserved GPUs can be resold, rented out or shared without approval.

Reserved GPU vs on demand is a utilization question, not a price question. A reservation charges every hour of the term whether your GPUs work or not; hourly rental charges only the hours you run. Reserve when you'll use a bigger share of the term than the reserved price is of the hourly price you'd otherwise pay. Otherwise, stay hourly.

That one ratio decides it. Here is how to compute it, the cases where it tips, and the hybrid most teams should run.

## The break-even, in one line

```text
break-even utilization = reserved price per GPU-hour / hourly price per GPU-hour
```

If the reserved price is 70% of the hourly price you'd actually pay, the reservation wins only when you keep the GPUs busy more than 70% of the term. Below that, you're paying for idle hours you would never have rented.

Flip it around and you get your **real** reserved price: the reserved price divided by the share of hours you use.

| Share of the term you use | Real price per used GPU-hour |
|---|---|
| 100% | 1x the reserved price |
| 75% | 1.33x |
| 50% | 2x |
| 25% | 4x |

A reservation you use half the time costs double its sticker price for every useful hour. Be honest about your utilization before you sign anything.

## Which hourly price to compare against

Not a list price on someone's website. Compare against the price you would really pay for the same work.

- **If your work tolerates interruption,** compare with spot. Spot B300s were the cheapest tier at the time of writing (November 2026): on 6 November 2026, twelve 8x B300 spot machines were listed on Arrakis (Arrakis market data).
- **If it doesn't,** compare with on-demand. Across providers, the on-demand B300 had a median of about $9.50 per GPU-hour in November 2026, after rising about 14% in 90 days (getdeploying.com).

Those two numbers can point in opposite directions. Against spot, a reservation has to be cheap and nearly always busy. Against a rising on-demand market, a fixed price for the term starts to look like insurance. Today's lowest hourly B300 price is [the live price](/gpus/b300.html.md) per GPU-hour, and the reserved price for each GPU is on [the reserve page](/reserve.html.md).

## A worked term

Take eight GPUs for three months. Three months is about 2,190 hours (3 x 730), so the term holds 8 x 2,190 = 17,520 GPU-hours.

- **Reserved:** you pay for all 17,520 at the reserved price, 25% when you sign and the rest monthly.
- **Hourly:** you pay for the GPU-hours you run, at each rental's locked price.

Say your plan runs the eight GPUs 16 hours a day, weekdays only. That's 16 x 5 x 13 = 1,040 hours per GPU over 13 weeks, about 47% of the term. The reserved price would have to be under 47% of your hourly price to win. If the same eight GPUs serve production around the clock, utilization sits near 100% and almost any discount wins. Same GPUs, same price, opposite answers.

## When to reserve

- **A steady base load.** An endpoint serving customers 24 hours a day, for months.
- **A training calendar you trust.** Runs booked back to back for the whole term.
- **You need bare metal.** Reserved GPUs can come as whole servers with your own operating system.
- **You can resell the idle hours.** Reserved GPUs on Arrakis can be resold, rented out, subleased or shared under your own name, without approval. Hours you resell earn money instead of sitting idle.
- **You want price certainty.** The price per GPU-hour is fixed for the term, whatever the market does.

## When to stay hourly

- **Research with no fixed calendar.** Bursty work makes utilization a guess. Pay for the hours you use.
- **Less than a month.** Reservations start at one month, so anything shorter is hourly by definition.
- **Work that fits spot.** Jobs that save checkpoints off the machine and resume elsewhere are hard for any reservation to beat. The recipe is in [spot GPU training with checkpoints](/blog/spot-gpu-training-checkpoints.html.md).
- **You might change GPUs.** Hourly rental lets you move to whichever GPU is cheapest for the job each week.

## The hybrid: reserve the floor, rent the peaks

Look at last quarter's usage and find the floor: the GPU count you never dropped below. Reserve that. Rent everything above it by the hour, with a capped token per pipeline and a removal time on every machine, so the peaks end when the work does.

A team whose usage swings between 8 and 32 GPUs reserves 8 and rents up to 24 more at peak. The 8 are busy all term; the 24 bill only while they work. The no-commitment half of this setup is described in [enterprise GPU capacity without a contract](/blog/enterprise-gpu-capacity-no-contract.html.md).

## Buying is the longest reservation

A purchase is the same bet with no end date and all of it paid up front. New 8-GPU B300 nodes were appraised at $400,000 to $520,000 in October 2026 (amcompute.com). At a hypothetical $50 an hour for an 8x B300, $400,000 pays for 8,000 hours: about 11 months round the clock, before power, cooling, rack space or staff. The utilization rule above applies with more force. An owned GPU's purchase price is the same whether it works or idles, so every idle hour raises the real price of the busy ones. Rented hours bill only while a machine runs. The full math: [rent vs buy GPUs in 2026](/blog/rent-vs-buy-gpu-2026.html.md).

## Before you sign

Write four numbers down, not one:

1. **Utilization**, from last month's real usage, not from the plan.
2. **The hourly price you'd actually pay**, spot or on-demand, for the same work.
3. **The idle-hour plan**: resell, share with another team, or accept the loss.
4. **Start date and form**: when the term begins, and bare metal or machines.

If the first two clear the ratio and the third has an answer, reserve.

## How reserving works on Arrakis

1. **Tell us what you need:** which GPU, how many, for how long, from when, and whether you want bare metal or machines with root SSH. Use the console's **Reserve** page or the API.
2. **Sign and pay a quarter.** We send an agreement within a working day. 25% of the total is paid at signing, the rest monthly over the term.
3. **Use them, or sell them.** Your GPUs start on the date you chose.

To see what you can reserve, from when and on which conditions, call the public offer (with your API key it has the prices too):

```sh
curl -s https://arrakis.goodailabs.com/v1/reserve
```

Founders weighing this against a prepaid hourly budget will find the startup version of the decision in [the AI startup GPU budget](/blog/ai-startup-gpu-budget.html.md).

## Decide with your own numbers

Pull last month's usage, compute your utilization, and compare it with the ratio. If it clears, ask for a reservation on [the reserve page](/reserve.html.md). If it doesn't, keep renting by the hour from [the console](/console/).

New here? Use code [FIRST25](/console/?code=FIRST25) for $25 off your first deposit of $50 or more, until 31 December 2026.

## Rent the GPUs in this post

- [B300](/gpus/b300.html.md): [the live price](/gpus/b300.html.md) per GPU-hour now; rent in the console (/console/#/gpus?gpu_type=B300) or with the MCP tool rent_gpu.
- [B200](/gpus/b200.html.md): [the live price](/gpus/b200.html.md) per GPU-hour now; rent in the console (/console/#/gpus?gpu_type=B200) or with the MCP tool rent_gpu.
- [H200](/gpus/h200.html.md): [the live price](/gpus/h200.html.md) per GPU-hour now; rent in the console (/console/#/gpus?gpu_type=H200) or with the MCP tool rent_gpu.
- [H100](/gpus/h100.html.md): [the live price](/gpus/h100.html.md) per GPU-hour now; rent in the console (/console/#/gpus?gpu_type=H100) or with the MCP tool rent_gpu.

## Questions

**When is a reserved GPU cheaper than on demand?** When the share of the term's hours you actually use is higher than the reserved price divided by the hourly price you'd otherwise pay. If the reserved price is 70% of your hourly price, you need to use the GPUs more than 70% of the term.

**How long is a GPU reservation on Arrakis?** From one month up, for as many GPUs as you need. For less than a month, rent by the hour with no commitment.

**How do I pay for reserved GPUs?** 25% of the reservation's total when you sign, then the rest monthly over the term. The price per GPU-hour is fixed for the whole term.

**Can I resell reserved GPUs I'm not using?** Yes. Reserved GPUs on Arrakis can be resold, rented out, subleased or shared under your own name and prices, with no approval needed. You stay responsible for what your customers run.

## More from the blog

- [Enterprise GPU Cloud Without Contract: Prepaid Capacity](/blog/enterprise-gpu-capacity-no-contract.html.md): An enterprise GPU cloud without a contract: B300, B200 and H200 by the hour on a prepaid balance, spend caps per team, and reserved terms only when they pay.
- [Spot vs On-Demand GPU for Inference: An Enterprise Plan](/blog/enterprise-llm-inference-spot-vs-on-demand.html.md): Spot vs on-demand GPU for inference: serve production endpoints on on-demand, push batch and burst work to spot, and let removal times cap every bill.
- [gpt-oss-120b GPU Guide: 8-bit on a Single H200](/blog/gpt-oss-120b-single-gpu.html.md): gpt-oss-120b GPU memory: about 140 GB in 8-bit, so one H200 (141 GB) holds it; 70 GB in 4-bit fits one 80 GB card. Setups, cost per hour, deploy.

Every post: [/blog](/blog.html.md). RSS: [/blog/feed.xml](/blog/feed.xml).
